Skip to contentRoadmapStar

Free swimlane timeline maker — no signup, 4K image for PowerPoint

A swimlane timeline maker that opens with nine items across four team lanes, the handoffs between them drawn as dependencies, and a milestones view. Drag a bar to change the dates, add your own lanes, and export the whole thing as a 4K image for your slide. It’s free, with no account.

What this tool makes, and what it exports
Spec

What it makes

One timeline document with a lane per team, items, dependencies and milestones

Lanes

Any select field becomes the lane — team, workstream, or whatever you group by

Dependencies

Drawn between items and shown or hidden per view

Image export

PNG or SVG at 3840 × 2160 for 16:9, 3072 × 2304 for 4:3, or a custom size, always drawn in the light theme

Other exports

CSV, Markdown, and the full JSON document

Where it saves

Your browser, plus a file you download or keep open on disk.

Jul 2026
1234567
891011121314
15161718192021
22232425262728
2930311234
567891011
Platform
Shared API ready
Data
Event pipeline
The swimlanes view of this starter, exactly as the image export draws it.
Open the editorFree · No account · Runs in your browser

What you get when you open it

Nine items across four team lanes (platform, apps, data and operations), with a dependency chain running between them and a cutover milestone. The shared API item has two lanes waiting on it, which is the situation swimlanes exist to show.

Drag a bar to move it, or drag its edge to change its length. A second saved view shows the milestones alone, which is usually what a steering group means when it asks for "the timeline".

Why lanes at all?

Because four teams on four separate timelines can’t show you the handoff, and the handoff is where programmes go wrong. One chart, one axis, one place where two lanes touch in the same week.

A lane is whatever select field you group by: team, workstream or region. Avoid status. Horizontal position already carries time, so a lane called In progress puts the same item in two places at once.

Getting four lanes onto one slide

Name a frame and the chart renders into it. For 16:9 that’s a 4K image, 3840 × 2160, scaled so all four lanes fit. This is where lane discipline pays off: six lanes still read at that width, and nine don’t, whatever resolution you ask for.

The file you get is a picture for the slide. That’s the useful behaviour here, because the alternative is a dozen rectangles somebody has to nudge back into line every time a handoff moves.

An image gets questions and a file gets edits, so for a programme audience an image is almost always right. The guide to sharing a product roadmap covers the other cases.

For a worked example with a leadership view already saved, the Swimlane roadmap template opens with twelve items. For a single track with no lanes, the Timeline maker is the simpler start.

Open the editorFree · No account · Runs in your browser

Common mistakes

  • Naming lanes after people. The chart becomes a staffing plan and breaks the week somebody changes team.

  • Turning the dependency arrows off because the picture is tidier. The handoffs are the whole reason for putting four teams on one timeline.

  • Giving every lane the same number of items so it looks balanced. An empty quarter in one lane is information, and padding it hides the capacity you actually have.

Questions

How many lanes work on one slide?

Four to six. Past that, the bars get too short to label, and the point where two lanes touch stops being visible at reading distance.

Does it export a .pptx file?

No. The export is a 4K picture fitted to a 16:9 frame, with every lane and arrow in place.

Can I show one lane on its own?

Yes. Filter a saved view to a single lane and keep it beside the full one. A lane owner opens theirs, and nobody scrolls past three teams to find their own row.

Is it free?

Yes, with no account and no trial.

Last updated