Skip to contentRoadmapStar

Free timeline maker — no signup, 4K image for PowerPoint

A timeline maker that opens with nine items across four tracks, already drawn. Drag a bar or its edge to change the dates, add your own items, and export the whole thing as a 4K image for your slide. It’s free, there’s no account, and the timeline is a file you keep.

What this tool makes, and what it exports
Spec

What it makes

One timeline document — items with a start, an end, a track and an owner

Views

Timeline, board and table over the same items, as many saved views as you want

Image export

PNG or SVG at 3840 × 2160 for 16:9, 3072 × 2304 for 4:3, or a custom size, always drawn in the light theme

Other exports

CSV, Markdown, and the full JSON document

Milestones

Any item can be a milestone, drawn as a diamond on its date

Where it saves

Your browser, plus a file you download or keep open on disk.

Jul 2026
1234567
891011121314
15161718192021
22232425262728
2930311234
567891011
Design
Brief agreed
Three concepts
Design sign-off
Build
Front end
Back end
Content
Copy for every screen
The timeline view of this starter, exactly as the image export draws it.
Open the editorFree · No account · Runs in your browser

What you get when you open it

Nine items across four tracks (design, build, content and launch), with two milestones and real dates. There’s nothing to set up: change a date and you’re already using it.

Drag a bar to move it, or drag its edge to change how long it runs. Each item has a name, track, status, owner and dates, and you can add fields of your own. They travel with the file.

Getting it onto a slide

Choose a frame and the timeline renders into it. The 16:9 option is a 4K image, 3840 × 2160, that covers a slide edge to edge and stays sharp on a projector. The drawing is scaled to fit, so a bar running past the right-hand edge keeps its label. SVG comes out at the same proportions if you want to enlarge it.

You get a picture for the slide. A .pptx of shapes you could nudge is how a deck quietly stops matching the plan, and a screenshot has the same problem at a worse resolution. When dates move, export again and replace the image. The guide to roadmap slides in PowerPoint makes the full case for that habit.

Where a timeline stops being the right shape

If the lanes are teams and the handoffs between them are the point, use the Swimlane timeline maker; it draws the dependencies. If the window is one month at week resolution, the Monthly roadmap template is already set up that way. If you need a roadmap more than a schedule, the Product roadmap creator starts from themes and stages.

Open the editorFree · No account · Runs in your browser

Common mistakes

  • Building the timeline in slideware first. Rectangles hold no dates, so the second version costs as much as the first, and so does every version after that.

  • Putting sixty items on one timeline. Past about twenty bars, people stop reading. Group items into tracks and give each audience the filter it needs.

  • Using it as the project plan. Dependencies only appear if you draw them, and a launch with four teams needs a document that fails loudly when something slips.

  • Leaving milestones as short bars. Mark them as milestones so they draw as diamonds. A two-day bar reads as work; a diamond reads as a date.

Questions

Does it export a .pptx file?

No. It’s a 4K image for a 16:9 slide. Editable shapes would be one more thing to maintain by hand.

Is it free? Is there an account?

It’s free, and there’s no account. It runs in your browser, and the timeline saves to a file you keep.

Can I start from something other than this?

Yes. Every template on this site opens the same editor with a different document loaded, so pick the closest structure and change it.

Last updated